Thursday, December 4, 2008

Rapidly moving forward to 50% being finished...

I've been working on the model again for about 3 hours and have achieved quite some progress. Some of the things that appeared to be wrong on the second floor have been corrected and I've managed to get the first floor to a near-ready state as well. Between the first and second floor there are a lot of similarities, but on the other hand a lot of differences as well. The first floor will house the project managers and the consultants.

More details will follow later, but for now I'll keep the story short and let the pictures speak for them self.

Wednesday, December 3, 2008

The work continues...

It's been a few days again since the last update on the model, but no news in this case doesn't mean that nothing has happened in the meanwhile. I've been working hard on finishing up some elements on the 3th floor canteen. After I received an update on the official document of the design of the building I now know most (if not all) of the official colors that will be used for the various elements of the building, which meant it was time to do some corrections on this as well. Currently I don't have any new renders of the canteen floor though. I will try to get them online later this week after correcting some of the final things to be done.

Another part of the building I've been working on is the floor right below the canteen. This floor will be home to our webmasters and system administrators. The walls have been reworked in order to replace the plates in the inside of the outer walls with bricks and to remove the attachment parts for the windows as I chose to change the way the windows will be attached. Beside this, all of the inner walls have been added to the second floor as well as most of the interior of the floor.

In the upcoming days I hope to be able to completely finish up on the 3rd floor canteen as well as the floor below, which would mean that approximately 20% of the design work would be finished.

For those of you that know where to find me and have access to our office, there will be a prototype model to show what I've been working on and the way I designed some of the elements that you can find in the office model. Feel free to come by and have a look at it.


Tomorrow I will try to post an article about the design of the cabinets that can be found on the second floor renders.

Wednesday, November 26, 2008

First floor now furnished...

After finishing up a couple of things on the outer shell and correcting some of the errors that were in the model I started to disassemble the model into smaller models by separating the model in separate floors. After this it finally was time to start working on the inner walls as well as the interior. Which I have been working on the last few days for the top floor canteen and terrace.

Most of the interior is now in place for that floor and I consider the floor near finished at this point. There are a couple of things that need some reviewing and improvement, but all in all, I'm getting close to what it should be like.

Below you can see a couple of new renders of just the top floor with it's interior.

Tuesday, November 18, 2008

Nearly finished on the outer shell!!!

After some hard work last evening I have nearly finished the bodyshell. The last things to do now is finished the final parts and correcting some things that aren't as they should be yet. This means adding doors, hatches, vents, replacing a few of the windows, find a better solution for the glass facade at the front entrance, finishing the middle glass column and so on...

In other words, there's still a lot to be done about the outer shell but at least it getting close to a ready state. After I finish the body shell I will look into the interior of the building. This will mean that I will split up the model into it's separate sub models of each floor and will then go through them one by one to create the interior. I reckon this take me a couple of weeks to complete.

For now there's a new render of the model for you to look at. Note that the chimney of the fireplace and the fireplace itself are currently just try-outs to see what they will look like and need some work in order to properly fit in. It's not entirely to scale yet either. Beside that the railing on the terrace is also temporary and a try-out to see how it will work on the model. Currently it's just loose pieces that aren't attached to anything at this point.

Monday, November 17, 2008

A bit of work done again...

Unfortunately due to lack of time in the end of last week as well as this weekend I've not been able to do as much I wished to. Despite that some work has been done on the model. I have finished another 2 half floors and started on the final floor to be done. This one is a bit more complex then all the others due to the fact that it is partially open to house a terrace. Tomorrow I will hopefully be able to work on that and finish that floor as well, which would mean that except for some rework that needs to be done the outer shell is mostly finished.

I have made a quick render of the current state of the project. This time only one from the backside as there have been no changes to the front of the model at this time. Except for a temporary roof that I placed there.

A while ago I posted an estimate of the number of parts needed to build the outer shell. Not that I've gotten a bit further on the model I rechecked to current number of parts and there are around 24.000 parts in the model already, without the last floor being completed at this point. The previous estimate mentioned an expected 22.000 to 25.000 parts, which most likely I'm going to exceed. Considering the current partcount and the work to do before the outer shell is finished, I think the final part count for the outer shell will be around 28.000 to 30.000.

I will post an update on the project as soon as I have the last floor finished. See you next time.

Monday, November 10, 2008

Todays update of the progress.

And here we are again...

Unfortunately not that much has been done today, partly due some other obligations, but also because I've been experimenting around with the stairs, which cost me quite some time in order to find a way to keep the to scale and work out in the building (it's hard to get the height and distance covered if you need to rely on fixed size parts). In the end I found a way to create the stairs and to attach them to the pieces of wall and flooring that are attached to the glass column in the middle. Except for the ground level stairs they're all in now. Something that is still to be done about the stairs though is to find a way to add the safety walls to them. I still have to decide on how to manage that and it might even require me to redesign the stairs after all.

Also I've been able to finish up on the ground floor walls on the left side of the building and I've been correcting the height of the walls on the glass column, though the glass itself isn't the correct height at this point yet. Next to this I've also done some preparations for the 1st, 2nd and 3th third floor. The floors of these storeys is finished as well as the positioning of the windows. I hope to be able to get at least one or 2 of them finished regarding the walls, which would mean that in a few more days from now I should be able to get most of the outer shell of the building finished.

By now the parts count grows quite rapidly. By now we are talking about around 17.000 parts already and that's with 3 floors still missing. I expect the outer shell of the building to require around 22.000 to 25.000 parts to be complete! And then I'm not even talking about all of the interior of the building yet.

Here you can see the current state of the project:

In the render above you can see that I added some temporary paving around the building. On the top floor you can also notice two of the stairs that are in the building. The building contains a total of 14 stairs, spread in two separate staircases.

Here you can see the back side of the building, note that glass facade that has been added here. You can also see some more of the stairs going from floor to floor from the left side of the building to the right (and back). You can see that the stairs on the left side on the image above has a wide space between the stairs. In this area an elevator will be build.

Saturday, November 8, 2008

After a couple hours of hard work...

After a couple hours of hard work and after finally finding a somewhat faster method building the walls, I've been able to make quite some progress. Yesterday I got no further then the walls of the ground floor. So first thing to start on today was creating the ceiling in the area above the pillars, which forms part of the support of the storeys above.

The ceiling was quite a tricky part to design as there is no real way that I can support it from the bottom and it can't be thicker then 2 plates. Though giving in on the accuracy I found a way to at least somewhat supporting it on the white columns, and I don't think it looks that bad.
The second and third floor where quite easy to create, just straight forward like the ground floor with the exception that there is no corner removed like the ground floor. They were as well identical looking at the windows, the disadvantage was that due to the sizes of the modules, the plates are not identically positioned in the second and third floor. This meant that instead of just copying the entire module, I entirely needed to recreate the walls in order to keep them properly aligned.

The forth floor was somewhat different when looking at the window arrangements. At the beginning of the right wall there are 2 windows left out. And according to the architects drawings there should also be 3 windows removed from the end of that wall, but on that point the design drawings aren't too clear, so I need to see if I can find some more information on what it exactly looks like there.

All in all I'm quite satisfied with the result so far and now that there is more finished you can really see the effect of the mixed colors used for the walls. I think it looks great and stops the walls from being to flat, it adds to the realism.

From now on I will start making 2 renders when I post an update here. One from the front-right and one from the rear-left. This because I'm now getting to a point that design features of the back start getting hidden as well as that I will soon start working on the other half of the building.

Next thing I will start working on now is correcting some of the things that aren't as they should be yet. For example, the area on the first floor needs to have a door added to the wall. And if I feel up to it I might already start on some paving on the baseplates around the building, at least in the part that is getting closed to finished by now. I also need this in order to correct a technical issue with the white pillars, as currently they don't fit on the baseplate and need to be raised slightly.